Austria | Germany | France | Sweden | India | USA | China | Singapore
Crate.io presents Gantner Edge computing devices and GI.cloud at InteractiveWest
News | < 1 minute Reading Time |

Crate.io presents Gantner Edge computing devices and GI.cloud at InteractiveWest

Our Edge computing devices and our new GI.cloud was presented by our partners Christian Lutz and Jodok Batlogg (founders of Crate.io).

The presented project IllwerkeVKW group and Crate.io shows as well the potential of Edge computing, big data handling and machine learning to further improve asset management in a decentral and at the same time scalable environment with data streams of up to 10 000 measurements per second plus event based processing. Positive feedback confirms our adaptive and innovate platform for asset and energy services.

About GI.cloud

GI.cloud integrates high resolution measuring, high performance big data analytics and easy data accessibility. The innovative platform combines Gantner’s proven edge-type monitoring and control units, an adaptive cloud system and a comprehensive user interface and applications with State of the art APIs.

The flexible configuration of GI.cloud does not only allow customers to build the systems exactly to their needs but also protects their investment: once the powerful edge and scalable cloud modules are installed, together with customizable service plug-ins they will allow to meet higher demands in the future.

More articles

Events

AUTO TECH China 2023

The 10th China Guangzhou Automotive Test Expo, held within AUTO TECH 2023, is South China’s largest automotive test, evaluation, and quality engineering exhibition. It gathers full vehicle and component testing and validation technologies and services!

Read more...
Success Stories

Metro de Madrid Stays Ahead of Brake Problems

METRO DE MADRID is a railway company that provides public transportation services to Madrid and its metropolitan area. Currently, it is the most extensive metro network in Spain, with a length of 294 kilometers. With 302 stations, it is the third-largest network in Europe by kilometers, after those in London and Moscow. It has 2400 trains and makes an average of 650 million trips a year, with 350 million passengers.

Read more...
Success Stories

Wendelstein 7-X Stellarator

After 9 years in construction, the stellarator (nuclear-fusion machine) of the Max Planck Institute in Greifswald generated plasma for the first time on December 10, 2015. The reactor had been gradually ramped up over the past 12 months. The event was given extensive coverage in the media. Gantner Instruments specially developed sensors for temperature and strain measurement for the project, which are otherwise unavailable on the market.

Read more...
News

Strain Measurements on Flexible Pipeline Systems

NOV in Denmark tests flexible pipeline systems with the Gantner Instruments Q.bloxx modules.

Read more...
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.